Kyiv & Kyiv region · since 2017

Grid connection turnkey ⚡

Technical conditions, design, construction of 0.4–10 kV lines and substations, and the contract with DTEK. Everything is done by our own crews with our own equipment, with no middlemen.

Licensed contractor Own heavy equipment 0.4–10 kV networks
Lineman working on a power line from an aerial platform
500+completed projects
Turnkey From design to connection: one contract, one team, a fixed price
  1. Technical conditions
  2. Design & approvals
  3. Network construction
  4. Commissioning
  5. Contract with DTEK
Connection types

We connect sites
of any capacity

Each price is calculated individually after a free engineer visit. The full turnkey scope is included.

Standard · stage I

up to 16 kW

Private house, cottage or land plot. Grid within 300 m of the plot boundary. 220/380 V.

  • Application, conditions and DTEK contract
  • Service entry and switchboard
  • Earthing and measurements
Get a quote
Standard · stage II

16–50 kW

Large houses, cottages, shops, service stations. Grid within 300 m. 380 V.

  • Load calculation
  • 0.4 kV entry and metering
  • Turnkey connection
Get a quote
Standard · stage III

50–160 kW

Small production, agribusiness, retail and service sites. Grid within 300 m. 0.4 kV.

  • Power supply design
  • 0.4 kV lines and switchrooms
  • DTEK approvals
Get a quote
Non-standard

over 160 kW

Or the grid is more than 300 m away. Factories, residential complexes, cottage towns, agribusiness. 0.4–10 kV.

  • 10 kV overhead and cable lines
  • Substation installation
  • Commissioning
Get a quote
Our projects

Built by
our team

Photos from our real sites: substations, cable and overhead lines, earthworks and equipment.

Installed packaged transformer substation
SubstationTurnkey transformer substation
Block substation on a concrete foundation
SubstationSubstation on a foundation
Pole installation in winter
Overhead linePole installation
Power cable joint
Cable lineCable joints
Cable trench with warning tape
EarthworksCable trench
Parallel power cables laid in a trench
Cable lineCable laying
Heavy equipment on a field site
EquipmentOur own machinery on site
Cable work on a facade from an aerial platform
InstallationAerial platform work
Cables entering a substation
Cable lineCable entry to substation
Substation and overhead lines on site
TurnkeySubstation and 10 kV lines
Cable links between substation blocks
CablesCable links between substation blocks
Transformer in an open substation compartment
SubstationTransformer compartment
Capacitor bank panel
SwitchgearReactive power compensation
Substation at an industrial site
SubstationSubstation for an industrial site
Packaged transformer substation
Substation10/0.4 kV substation on site
Distribution cabinet with breakers
SwitchgearDistribution cabinet assembly
Cable route to a block substation
CablesCable route to the substation
Block substation on a foundation
Substation10/0.4 kV block substation
Pole with a line branch
OverheadBranch from a 10 kV overhead line
Deye 80 kW hybrid inverters in a switch room
Backup powerDeye inverters 2 × 80 kW
Backhoe backfilling a cable trench with warning tape
About us

General contractor since 2017

Vector Energy Group LLC builds power infrastructure on a turnkey basis: from technical conditions and design to installation, commissioning and handover.

We have our own design office, certified electricians with up to 10 kV clearance and our own fleet: cranes, aerial platforms and drilling rigs. So we don't depend on subcontractors and we meet deadlines.

500+Projects
2017On the market since
10 kVNetworks up to
0Middlemen
How we work

Four steps
to connection

Before work starts, we sign a contract with a fixed price and deadlines.

Consultation

Free engineer visit, scope assessment and cost estimate.

Design

We obtain technical conditions and prepare and approve the design documents.

Installation

Our own crews and equipment build the lines and install the equipment.

Connection

Testing, acceptance documents, the contract with DTEK and warranty support.

Reviews

What clients say

★★★★★

I needed power connected to a new plot near Boryspil. The team did everything turnkey, from technical conditions to signing the contract with DTEK. Fast and professional. Recommended!

Oleksandr KovalenkoPlot owner, Hora village, Boryspil district
★★★★★

We ordered a 250 kVA substation for our production site. Everything was on time and the paperwork was in order. Special thanks for a clear estimate with no surprises: the price never changed.

Ihor MelnychukDirector, Promtekhnolohiia LLC, Brovary
★★★★★

They built a 10 kV line for our farm: 2.5 kilometres of poles in 3 weeks. Top quality work and communication. Thank you!

Mykola KravchukFarm, Bila Tserkva district
Contact

Get a free
estimate for your site

Leave a request or message us on Telegram. An engineer will contact you within 30 minutes during business hours.

Request an estimate

By clicking the button, you agree to the processing of your contact details so we can get back to you.